Last weeks finished kitchen

All of the units removed, rewired and then replastered. The floor in the kitchen and conservatory was then fully retiled prior to the kitchen installation. Tall wall cabinets were specified to make use of the high ceiling and maximise the storage capacity.
A classic light Shaker door complimented with Oak effect work tops and matching upstanding, all completed from start to finish in less than 10 days.

Finished kitchen of the week

Again another full on project. The original kitchen removed, rewired then replastered. The floor then fully tiled prior to the kitchen installation. Both the kitchen and utility room was then refitted in a Lissa Oak shaker door with lovely contrasting Duropal work tops. 
Fully integrated appliances to the kitchen with two Hoptpoint Luce Pyrolitic ovens for maximum cooking opportunity!! 

Finally the splash back then retiled to compliment the floor and worktop choice. All in all a great project once again to be involved with working with great clients !!

Our Latest finished kitchen

Latest finished kitchen, in the popular hand painted dove grey. All integrated with space saving ideas. We tiled the floor completely prior to the installation of the kitchen. Simple matching up stands to the rear of the work tops and subtle glass splash back, all completed from start to finish in 7 days , we are the best !!!!

lovely natural oak shaker doors

Latest finished kitchen, lovely natural oak shaker door with calico acrylic work tops, matching up stands and window cill. Neff signature slide & hide oven with combination oven built in oven. Integrated fridge & freezer , twin corner pull out to make the entry into the corner far easier . Great project again with great clients. Can anyone spot the worktop joint!!!